Files
llm-multiverse-ui/.claude/commands/release.md
shahondin1624 978325565d feat: scaffold SvelteKit project with Tailwind, TypeScript, ESLint, Prettier
Initialize the llm-multiverse-ui project with:
- SvelteKit + Svelte 5 (runes mode enabled)
- Tailwind CSS v4 via @tailwindcss/vite plugin
- TypeScript strict mode
- ESLint 9 flat config with svelte and typescript-eslint plugins
- Prettier with svelte plugin
- Directory structure: src/lib/components/, src/lib/services/
- All required scripts: dev, build, preview, lint, format, check

Closes #1

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-12 11:03:46 +01:00

2.8 KiB

Release

You are the Release Manager agent. Your job is to create a release when a milestone is fully completed.

Trigger Rules

This agent is invoked in two contexts:

  1. Manual request — The user explicitly asks for a release. Merge the release PR yourself and proceed.
  2. Milestone completion — All issues in a milestone are completed (triggered from auto-dev). Create the release PR but do NOT merge it. Inform the user the PR is ready for manual approval.

Gitea Connection

  • Owner: llm-multiverse
  • Repo: llm-multiverse-ui

Input

$ARGUMENTS should be the milestone name or version (e.g., mvp, 0.1.0). If empty, ask the user.

Steps

1. Pre-flight Checks

  1. Ensure the working tree is clean (git status shows no changes)
  2. Fetch latest from origin: git fetch origin
  3. Verify all issues in the milestone are closed:
    • Use mcp__gitea__list_issues filtered by milestone
    • If any issues are still open, list them and stop
  4. Run quality gates on main:
    git checkout main && git pull origin main
    npm install
    npm run build
    npm run lint
    npm run test
    
    If any gate fails, stop and inform the user.

2. Create Release Branch

git checkout -b release/<milestone-slug> main

3. Update Version/Changelog

  • Bump version in package.json
  • Collect all merged PR descriptions for this milestone into a changelog entry
  • Commit:
    chore: prepare release for <milestone-name>
    

4. Create Release PR

Push the release branch and create a Gitea PR:

  • Title: Release: <milestone-name>
  • Head: release/<milestone-slug>
  • Base: main
  • Body: Summary of all issues completed in the milestone, with links

If milestone-triggered: STOP here. Inform the user the release PR is ready. If manually requested: Proceed to merge.

5. Merge and Tag

  1. Merge the PR via mcp__gitea__pull_request_write with merge_style: "merge"
  2. Pull updated main:
    git checkout main && git pull origin main
    
  3. Create a tag:
    git tag <milestone-slug>
    git push origin <milestone-slug>
    

6. Create Gitea Release

Use mcp__gitea__create_release:

  • tag_name: <milestone-slug>
  • target: main
  • title: <milestone-name>
  • body: Release notes listing all completed issues

7. Close the Milestone

Use mcp__gitea__milestone_write to set the milestone state to closed.

8. Output Summary

Display:

  • Milestone name and version
  • PR number and merge status
  • Tag created
  • Issues included (count and list)
  • Link to the Gitea release page
  • Next milestone to work on

Critical Rules

  • Never force-push to main
  • Always go through a PR — never merge directly
  • Always run quality gates before releasing
  • The tag must be on the main branch
  • Close the milestone after release